724-746-5500 | blackbox.com
Page 57
Chapter 6: Operation
8. After the readings are downloaded, press the “Edit Report”
button to launch the spreadsheet. If you wish to change any
NAMES that you created, do it in this opening screen. You can
wait until they are in the spreadsheet, but it is quicker here.
Figure 6-62. Edit Report screen.
9. The sequential number (1–250) automatically assigned by the
LPV to each stored test will appear as “Reading: Cable#1,
Reading: Cable#2,” etc. in the spreadsheet along with any
custom name that you created. The “Reading #” can only be
modified in the spreadsheet.
NOTE: The LPV allows duplicate custom names, but when they
are printed in Excel, they will appear as “Jack A,” “Jack A
(2),” “Jack A (3),” etc. unless you change the name here.
10. When satisfied, press Finish. The spreadsheet named “LPV.
XLS” will appear. One cable test reading occupies one work
-
sheet. It works like an Excel spreadsheet (save it under a dif-
ferent name, change the names in the cells, etc.). When you
are ready to print, select FILE, PRINT and in the PRINT WHAT
dialog box select ALL. All the cable test readings will print
(one per page).