7. To continue the two-way
test, switch the connectors
that attach to the cable
under test as shown in the
graphic.
NOTE
Do not switch the launch cable
connectors that are attached to the
units.
8. Press
F1 (Run)
to
complete the two-way test.
39
CHAPTER 4: Operation: Automatic Measurements