Operating instructions eS10
Installation
38034911005 en
17
4
4
Installation
4.1
Transport and storage
Always transport and store the device in its original packaging. If the device was stored in
an area with low temperatures before being unpacked, the device could condensate in a
room with normal temperatures after being unpacked.
Switch on device only after it has reached room temperature and no longer condensates.
In order to accelerate this process, remove load platter, if necessary.
4.2
Installation and assembly
Carefully unpack load receptor at place of installation. Pay particular attention to connect-
ing cables.
Do not lift device on load platter (upper platter), always lift on base
frame (lower platter).
Install the device so that it is easily accessible for operation, maintenance and cleaning.
Additional assembly of weighing conveyors or roller conveyors on the load receptor only
after consultation with Bizerba.
For other manufacturers' equipment included in our scope of supply, the respective manu-
facturer's regulations take preference if they deviate from our conditions.
Parts which have been moved must not be electrically charged. Driven
weighing conveyors or roller conveyors must comply with Machinery Di-
rective 2006/42/EC.
DANGER
Formation of condensed water in the device!
The consequences can be:
–
Life threatening injuries due to electric shock
–
Damage to property
–
Bring the device to room temperature before first switching it on.
–
Avoid large temperature fluctuations.
–
Do not exceed the maximum permissible ambient temperature.