BIODOSER INSTALLATION
3. Push the end of the drum weight hose through
the drum lid.
DRUM WEIGHT HOSE INSTALLATION
2. Drill a 6.5mm or 1/4 inch hole into the top of the
drum lid.
1. Remove the lid from the supplement drum that
you will use.
4. Fit the hose onto the drum weight tube fitting in
the same way as described in the
Tee Piece Hose
Installation
section above and illustration below.
AFTER ALL HOSE FITTINGS ARE COMPLETED, TEST THE SYSTEM WITH FRESH WATER, USING THE
MANUAL DOSE FUNCTION (PAGE 9). CHECK CAREFULLY FOR ANY LEAKS AND CORRECT AS NEEDED.
4. Tighten the nut over the hose. Tighten firmly
with fingers. DO NOT USE A TOOL.
TEE PIECE HOSE INSTALLATION
3. Push the hose firmly onto the tube fitting.
1. Remove the nut from the one way valve fitting on
the Tee piece.
2. Slip the Nut over the hose.
8