background image

EN

77-3095-R1.0  (8/2015)

4 / 8

Verify the wiring inside the barrier box by referring to the tables below. See the 

77-2983 Maintenance & 

Repair Manual

 for a wiring diagram and enclosure locations.

Installation

The remote color change box is designed to be used inside a hazardous environment, such as a spray 

booth, however, the Zener barrier box must remain with the GEMS control in the non-hazardous area. 

Mount the barrier box to the GEMS mast as described below.

Mount the barrier box to the GEMS mast using the 

mounting bracket and supplied bolts and nuts, as 

shown.

Installation should be performed by a qualified electrician. Improper installation could create a 

spark, resulting in fire or explosion.

!

 WARNING

TABLE B—ENCLOSURE WIRING

WIRE 

NUMBER  

& COLOR

ENCLOSURE 

LOCATION

DESCRIPTION

219

  

RED

L2C14

+24v

322

  

WHITE

L3D7

Signal

276

  

BLACK

L2C24

DCC

none

  

GREEN

ground

TABLE A—BARRIER WIRING

WIRE  

NUMBER  

& COLOR

BARRIER  

TERMINAL  

(1-8)

219

  

RED

8

322

  

WHITE

5

276

  

BLACK

6

none

  

GREEN

GRD foot

4421

  

RED

1

4441

  

WHITE

4

DCC

  

BLACK

3

Summary of Contents for GEMS 240-3053-1

Page 1: ...EN 77 3095 R1 0 8 2015 1 8 OPERATION MANUAL 240 3053 1 REMOTE COLOR CHANGE BOX INSTALLATION INSTRUCTIONS GLOBAL ELECTRONIC MIX SOLUTIONS PLURAL COMPONENT MIXING SYSTEM...

Page 2: ...ays follow the pressure relief procedure in the equipment instruction manual NOISE HAZARD You may be injured by loud noise Hearing protection may be required when using this equipment STATIC CHARGE Fl...

Page 3: ...for in booth capability of Remote color change box Paint flow meter on GEMS fluid panel Solvent flow meter on GEMS fluid panel This manual describes the installation of the barrier box and remote colo...

Page 4: ...the barrier box to the GEMS mast as described below Mount the barrier box to the GEMS mast using the mounting bracket and supplied bolts and nuts as shown Installation should be performed by a qualifi...

Page 5: ...2015 5 8 The barrier box cable 240 3072 3 will connect to the terminals indicated here Reroute the new harness into the enclosure and connect wires 219 276 and 322 in the correct terminal positions as...

Page 6: ...ERMINAL 4441 4 4421 1 DCC 3 Run the required length of pneumatic tubing for the color change box The 5 32 tubing should enter the GEMS enclosure in the top right bulkhead when viewed from the back sid...

Page 7: ...tal waste container Flow will stop when the paint is loaded and ready to spray Engage atomizing air to begin spraying ALARMS The pneumatic indicator will show when the unit is in alarm mode To silence...

Page 8: ...an authorized distributor contact one of our international sales and customer support locations below USA Canada www binks com info carlisleft com Tel 1 800 992 4657 Fax 1 888 246 5732 United Kingdom...