
FED / FED-UL (E2) 01/2022
page 16/60
2.1 Equipment overview
(1) Display
(2) Set-point value key
(3) Selector keys
(4) Time management key
(5) Switch ON/OFF
(6) Lever for ventilation slide
(7) Safety device
(8) Door handle
(9) Switch for interior lighting
(with
option interior lighting)
or
Buzzer switch (with option
audible over-temperature
alarm)
(10) Main power switch
Figure 3: FED drying and heating oven
3. Completeness of delivery, transportation, storage, and
installation
3.1 Unpacking, and checking the equipment and completeness of delivery
After unpacking, please check the chamber and its optional accessories, if any, based on the delivery
receipt for completeness and for transportation damage. Inform the carrier immediately if transportation
damage has occurred.
The final tests of the manufacturer may have caused traces of the racks on the inner surfaces. This has no
impact on the function and performance of the chamber.
Please remove any transportation protection devices and adhesives in/on the chamber and on the doors
and take out the operating manuals and accessory equipment.
CAUTION
Risk of injury and damages by lifting heavy loads and by sliding or tilting of the
chamber due to improper lifting.
Injuries, damage to the chamber.
∅
Do NOT lift or transport the chamber using the door handle or the door.
∅
Do NOT lift chambers by hand
Lift chambers from the pallet using technical devices (fork lifter). Set the fork lifter only
from the rear in the middle of the chamber. Make sure to place all the lateral supports
of the chamber on the forks.
(6)
(9)
(7)
(8)
(10)
(1)
(2)
(3)
(4)
(5)
Summary of Contents for 9010-0216
Page 52: ...FED FED UL E2 01 2022 page 52 60...
Page 54: ...FED FED UL E2 01 2022 page 54 60...
Page 61: ......