EN
Operating manual No.
057-2-6-0015-R0
Version 2021
P. 20
5.3
Commissioning
The tests to be carried out before using the machine have the task of checking that the
mechanical and electrical installation has been carried out correctly and there are no
breakages or damages that could compromise the proper functioning and the performance of
the machine.
Make sure:
There are no signs of obvious breakage or damage of the mechanical structures;
The electrical wiring and plug protections are in perfect condition;
The power plug is properly inserted in the socket;
The connection to the electrical system is suitable for power and amperage in order to
power the actuator (refer to the data on the plate shown on the lift).
Summary of Contents for LEB-50 LIFT
Page 29: ...Operating manual No 057 2 6 0015 R0 Version 2021 P 29 EN 9 Accessories ...
Page 30: ...EN Operating manual No 057 2 6 0015 R0 Version 2021 P 30 SPARE PARTS TECHNICAL DRAWINGS ...
Page 31: ...Operating manual No 057 2 6 0015 R0 Version 2021 P 31 EN ELECTRIC ACTUATOR MANUAL ...
Page 32: ... 1 LINEAR ACTUATOR Operating Manual Version S N Date Version 1 2019 09 27 VER 1 0 ...
Page 35: ... 4 2 Product Type DS M 05 Product Code Product Series Company Code ...
Page 37: ... 6 4 Dimensional Drawing ...
Page 40: ...NOTES ...
Page 41: ...NOTES ...