21
Step 7: Monkey Ladder Assembly
C:
Attach (1858) 1-1/8 x 18-5/8” Dowel to both posts with 2 (S2) #8 x 1-1/2” Wood Screws per dowel. One screw
is installed from top of the rails and the other from the bottom as shown in fig. 7.3.
D:
At bottom of (1367) Post MK attach (0353) MK Ground with 2 (H12) 1/4 x 3” Hex Bolts (with lock washer, flat
washer and t-nut).
Be sure to keep the bolts loose.
(fig. 7.3)
Note: Pre-drill all holes using a 1/8” drill bit before installing the lag screws.
E:
Make sure the assembly is square and then attach 1 (0369) Lower Diagonal to each end of (0353) MK Ground
with 1 (H2) 1/4 x 2” Hex Bolt (with lock washer, flat washer and t-nut), keeping the bolts loose, and to each (1367)
Post MK with 1 (LS2) 1/4 x 2-1/2” Lag Screw (with flat washer). Once lag screws are installed tighten all bolts from
Steps D & E. (fig. 7.3)
A:
Insert 1 (1858) 1-1/8 x 18-5/8” Dowel into 2 (1367) Post MK as shown in fig. 7.1.
B:
Make sure shoulder of dowel is against each post before pre-drilling pilot
holes. Drill 1/8” pilot holes through the posts and into the dowel to prevent
splitting. (fig. 7.2)
Wood Parts
Hardware
2 x
1/4 x 3” Hex Bolt (1/4” lock washer, 1/4” flat washer, 1/4” t-nut)
2 x
1/4 x 2” Hex Bolt (1/4” lock washer, 1/4” flat washer, 1/4” t-nut)
2 x
1/4 x 2-1/2” Lag Screw (1/4” flat washer)
2 x
#8 x 1-1/2” Wood Screw
2 x
Lower Diagonal 2 x 3 x 37”
1 x
MK Ground 1 x 4 x 55-1/4”
2 x
Post MK 2 x 3 x 70”
1x
Tennon Dowel 1-1/8 x 18-5/8”
0369
S2
0353
1367
1858
LS2
H2
H12
0369
1367
0353
LS2
H2
S2
1367
1858
H2
LS2
1858
1367
0369
Fig. 7.1
Fig. 7.3
1/4” Flat
Washer
1/4” Lock
Washer
1/4”
T-Nut
1/4” Flat
Washer
Fig. 7.2
1858
H12
Summary of Contents for F23850
Page 3: ...3 support solowavedesign com...
Page 4: ...4 support solowavedesign com...
Page 5: ...5 support solowavedesign com...
Page 53: ...53 support solowavedesign com Final Step Attach I D Plaque...
Page 54: ...54 support solowavedesign com NOTES NOTES...