16
operatIoN
INstallatIoN
see also the sections on safety and Installation.
1. Place the unit on a suitable flat bench or in a fume cupboard if required, ensuring that the air vents
on the rear and underside are free from obstruction.
2. Plug the mains cable into the socket on the back of the instrument.
3. Fill the aluminium bucket with the ceramic-coated beads and place the bucket inside the unit.
4. Connect to the mains electricity supply with the plug provided or one wired correctly for the supply.
Switch the power ON from the switch located next to the mains input lead. The front display will
then light up.
poWer up screeN
When first switched on, the display will show the name of the product and then show the current
temperature of the unit. The unit will then proceed to heat or cool to the set temperature.
froNt paNel coNtrols
The front panel consists of two buttons for setting the unit temperature and a 5 digit LED display.
the up arroW Button
When this button is pressed,
the set temperature is increased.
the doWN arroW Button
When this button is pressed,
the set temperature is decreased.
Nº ICE
Nº ICE
Nº ICE
Nº ICE
UP ARROW
Button
DOWN ARROW
Button
LED Display
Nº ICE
Nº ICE
Nº ICE
UP ARROW
Button
DOWN ARROW
Button
LED Display