- 32 -
INST
ALLA
TION
INSTALLATION
•
Before installing the boiler on an existing
c.h. system, flush it out thoroughly before
fitting the boiler, so as to remove muddy
deposits.
It is advisable to equip the system with a
sediment filter, or use a water-treatment
product in the circulating water.
The latter option in particular, not only
cleans out the system, but also has an anti-
corrosive effect by promoting formation of a
protective skin on metal surfaces and neu
-
tralising gases present in the water.
We recommend the use of a suitable uni
-
versal inhibitor to protect the c.h. system
from corrosion.
6.3 Installing the bracket
Precautions
Before mounting the bracket, check that the
dimensions for fitting the exhaust fume duct
are complied with (refer to the leaflet includ
-
ed with the flue kit, packed separately).
Utilise the paper template supplied with the
boiler to determine the fixing position for
the bracket and boiler. Securely mount the
bracket to the wall using appropriate fixings
suitable for the type of wall construction and
capable of supporting the total (wet) load.
Refer to the weight given in the technical
data tables specific for each model.
6.4 Overall dimensions
The boiler respects the following dimensions:
A
Flue outlet / air intake pipe (co-axial)
B
Flue outlet pipe ø 80 mm (twin kit)
C
Air intake pipe ø 80 mm (twin kit)
D
Electric connections area
E
C.h. flow
F
Gas
G
C.h. return
H
Condensate drain connection area
Fig. 6.2
ø80
ø80
ø100
400
200
47
245
196
803 700
35
115
142
16
31
60
60
100
257
200
129
117
50
73
350
198
Boiler
fron
t
140
130
A
A
B
B
C
C
D
H
E
E - G
F
F
G
6.5 Joints
Functions
Pipe sizes
(o.d)
Gas, c.h. return, c.h. flow
ø 22
Pressure relief valve
ø 15
Condensate drain
ø 25 (plastic)
sizes in mm o.d.
6.6 Mounting the boiler
•
Take the protective caps off the boiler
pipework.
•
Thoroughly clean the connections.
•
Mount the boiler on its bracket.