
23
Fig. 6.20
Fig. 6.22
Fig. 6.23
Fig. 6.21
6.7.2
Payment system installation
The distributor does not have a payment system; any possible
damages to the distributor itself and/or objects and/or people
deriving from its incorrect installation are responsibility of who
installs the payment system.
In-series arrangement for connection of the validator unit, 12-24 V.
For Executive/MdB kit payment systems.
The switches are to be directly connected to the keyboard card,
the executive serial systems require the payment system kit
supplied separately.
Then go into programming for the correct settings.
Consult chapter” 7.0 SOFTWARE INSTRUCTIONS ” so as to ve-
rify setting of the parameters, that must be coherent with the
system used.
6.7
Product container loading
(with machine off)
6.7.1
Loading containers
Filling is possible keeping the containers inserted, and by raising
the upper flap of the distributor (
Fig. 6.20
) or by extracting each
container.
For granulated coffee in particular it is necessary to close the
closure plat before extracting the container.
(Fig.6.21)
.
– remove the covers of each container and load the product accor-
ding to the product indicated on the label
(Fig.6.22-Fig.6.23).
– pay attention that they there are no clots, avoid pressing the
product and using an excessive quantity, so as to avoid its
aging in relation to the consumption forseen in the time period
between two loadings.
Check the container product capacity in the section TECHNICAL
CHARACTERISTICS.