
BestCode Next Series 8 Technical Manual
October 2022
Page 144 of 290
Gutter Detect Replacement
Be familiar with proper
Procedure Time: 15 minutes
1.
Pull the gutter tube off of the gutter
barb.
2.
Remove the heatshrink from the black
coax cable.
3.
Lift out the gutter detect.
Summary of Contents for Next 8 Series
Page 2: ......
Page 3: ......
Page 4: ......
Page 143: ...BestCode Next Series 8 Technical Manual October 2022 Page 129 of 290 USB ...
Page 144: ...BestCode Next Series 8 Technical Manual October 2022 Page 130 of 290 Collector Information ...
Page 259: ...BestCode Next Series 8 Technical Manual October 2022 Page 245 of 290 ...
Page 264: ...BestCode Next Series 8 Technical Manual October 2022 Page 250 of 290 ...
Page 268: ...BestCode Next Series 8 Technical Manual October 2022 Page 254 of 290 ...
Page 276: ...BestCode Next Series 8 Technical Manual October 2022 Page 262 of 290 Using the Molex Crimper ...
Page 277: ...BestCode Next Series 8 Technical Manual October 2022 Page 263 of 290 ...