Rod source shields LB 8300
5 Usage
64217BA2 Rev. 00, 10/2017
29
5.3
Commissioning
To commission the shield after installation, proceed as follows:
1.
Remove the transport lock.
2.
If applicable, remove the padlock.
1
2
3
Padlock
OPEN position
Fixing screws
Fig. 10
Shield open (OPEN position)
3.
To open the shield directly before commissioning the measuring system: Turn
the locking cylinder to the OPEN position.
4.
Retain the locking cylinder in the new position using fixing screws.