background image

11

Operating the valve with the 

Subtv

 controller reduces the too  

high pressure settings during the low demand hours.  
For example, in typical such pressure regime, the day low 
pressure hours are between 10:00 AM and 06:00 PM and the 
night low pressure hours are between 10:00 PM and 06:00 AM, 
during the high demand hours the valve maintains the high  
pressure setting. 

Therefore, the three required program parameters of the controller 
are: Operation Time - 8 hours, Operation Days - 7 days and two 
Start Times one at 10:00 and the other at 18:00.

1. Operation Time:

Use the 

 button to move to the Operation Time programming 

screen, this is the screen with blinking 

 icon, blinking triangle 

with the digit 1 in it, and the 

 icon. Use the 

 and the 

 

 

buttons to set the required operation time (8:00 hours in our example).

Press the 

 button to move to the next programming screen 

which is the Operation Days screen.

2. Operation Days:

Use the 

 to set a particular day as an operation day, the cursor 

will advance to the next day. In our example set all 7 week days 
for operation. 

Press the 

 button to move to the next programming screen 

which is the Start Times screen.

3. Start Times:

Use the 

 and the 

 buttons to set the first required Start 

Timed (10:00 in our example).

Press  the 

 button to move to the second Start Time and set  

it as required (22:00 in our example). 

The controller is now set for automatically operating the Pressure 
Management Application. 

Summary of Contents for Subtv

Page 1: ...Water Control Solutions Installation Operation Manual Subtv Controller for BERMAD Waterworks Applications...

Page 2: ......

Page 3: ...Table of Contents Introduction 3 Technical Data Installation Instructions 4 5 Control Panel 6 7 Programming 8 16 Monitoring 17 Manual Operation 18...

Page 4: ......

Page 5: ...t provides installation and operation instructions for the Subtv controller as it is used with the following Bermad control valves waterworks applications Pilot change at High Low pressure management...

Page 6: ...the battery should last for at least one season Hydrometer Bermad s 900 series Hydrometer or a water meter with pulse output is used in pipes dead end purging application where the purged out water is...

Page 7: ...lenoid s black wire Joint together with the solenoid s red wire in a black cable No polarity significance in this connection Water meter Red Connect one of the water meter s pulse wires to one of the...

Page 8: ...sed to advance to the next screen or programming step SHIFT button Used to sequentially change the focus between the items of the current screen PLUSE ON button Used to increase numeric data set on op...

Page 9: ...llowing icons are not related to BERMAD applications Operation Days Setting Mode Manual Operation Set Time Time Mode Sequential Program Volumetric Mode Semi Auto seq Operation Operation Time Uncontrol...

Page 10: ...e is checked by the controller it must be a DC latch solenoid for BERMAD applications The word dC appears on screen indicating that the type of solenoid found is DC When the controller is operated by...

Page 11: ...The third setting screen is used for setting the system time and day of the week System Time Use the and the buttons to set the system time Hold the button pressed to quickly advance the digits Press...

Page 12: ...so equipped with a high flow switch that can stop the low pressure regime when higher demand for water is detected such as in case of fire The following chapter describes the programming steps require...

Page 13: ...ng screen this is the screen with blinking icon blinking triangle with the digit 1 in it and the icon Use the and the buttons to set the required operation time 8 00 hours in our example Press the but...

Page 14: ...tart time set for the operation day with up to three start times per such day The following examples depict three typical scenarios A Purging interval by Days of the Week and purging amount by operati...

Page 15: ...nterval by Days Interval and purging amount by operation time In this example the pipe needs to be purged for 5 minutes every 10 days at 08 00 AM Therefore the three required program parameters of the...

Page 16: ...gramming screen which is the Start Times screen 3 Start Time Use the and the buttons to set the required Start Time 08 00 in our example The controller is now set for automatically operating this Dead...

Page 17: ...interval than this parameter a High Flow indication is presented by the controller and the operation stops See the fault messages paragraph in the monitoring chapter below The factory default is 60 s...

Page 18: ...xt programming screen Move to the Operation length programming screen this is the screen with blinking icon blinking triangle with the digit 1 in it and the icon Use the and the buttons to set the req...

Page 19: ...el the fault check the system for the cause of the fault repair the necessary components and then press the and the buttons simultaneously for 2 seconds Please note When a fault message is displayed o...

Page 20: ...conds The icon appears Use the and the buttons to start or stop the operation of the valve Please note that when manually started the valve operates for the duration of its programmed operation time o...

Page 21: ...19...

Page 22: ...20...

Page 23: ......

Page 24: ...d com Copyright 2007 2012 Bermad CS Ltd All Rights Reserved The information contained in this document is subject to change without notice BERMAD shall not be liable for any errors contained herein PI...

Reviews: