background image

8

INSTALLATION

8  UNPACKING THE PRODUCT

B

 

IDRA DS FI

 solar heaters are supplied in a single 

package on a wooden pallet.

The boiler comes with a solar station supplied with solar 

regulator  already  wired  to  the  high-efficiency  circulator, 

and two non-wired probes to be inserted in the boiler sock-

ets.

The following items are delivered in a plastic bag inside the 

packaging:

-  Instruction manuals

-  Bar code label

-  Hydraulic test certificate

-  Energy label (to be applied to device upon installa-

tion)

-  No. 1 solar probe PT1000

-  No. 2 probes NTC.

The instruction manual is an integral part of the so-

lar storage cylinder. Once located, read it thoroughly 

and keep it safe.

For handling operations, thoroughly follow the in-

structions on device package label.

9  ACCESS TO THE SOLAR STATION

To access the solar station it is necessary to remove the 

solar regulator covering (1) and then the front insulation (2).

1

2

10  PLACE OF INSTALLATION

B

 

IDRA DS FI

 storage cylinders can be installed in any 

room where there is no specific requirement for an electri-

cal protection rating higher than IP X0D.

≥ 0,3 m

≥ 0,8 m

≥ 0,3 m

≥ 0,8 m

≥ 0,7 m

NOTE:

 the above-indicated dimensions are recommended 

for a correct maintenance and access to the device.

When  installing  the  boiler,  allow  sufficient  space 

around it to access all safety and control devices and 

to permit easy maintenance.

11  INSTALLATION IN OLDER 

SYSTEMS AND SYSTEMS 

REQUIRING MODERNISATION

When installing 

B

 

IDRA DS FI

 storage cylinders in old 

systems or systems requiring modernisation, always per-

form the following checks.

-  Make  sure  that  the  system  is  fitted  with  safety  and 

control devices in accordance with applicable legis-

lation and standards

-  Make sure that the central heating circuit has been 

flushed out to remove all sludge and lime scale, and 

has been vented and seal tested

-  Make sure that a suitable water treatment system is 

installed if the quality of the supply/recirculation water 

so demands (refer to the reference values listed in 

the table alongside).

12  WATER QUALITY 

REQUIREMENTS

REFERENCE VALUES

pH

6-8

Electrical conductivity

less than 200 μS/cm (25°C)

Chlorine ions

less than 50 ppm

Sulphuric acid ions

less than 50 ppm

Total iron

less than 0.3 ppm

Alkalinity M

less than 50 ppm

Total hardness

less than 35°F

Sulphur ions

none

Ammonia ions

none

Silicon ions

less than 30 ppm

The values above ensure proper operation of the system. 

Refer to the limit values specified in the current standards 

and regulations on the installation site.

Installation

Summary of Contents for IDRA DS 200 FI

Page 1: ...Installation and Operation Manual Solar Solar storage cylinder IDRA DS FI Installation and Operation Manual EN...

Page 2: ...following symbols are used in this manual b CAUTION Identifies actions that require caution and adequate preparation a STOP Identifies actions that you MUST NOT do This manual Code Rev comprises page...

Page 3: ...p the product purchase documents to be presented to the B authorised Technical Assis tance Centre to request a service call under warranty b Size the solar expansion tank so as to ensure com plete abs...

Page 4: ...chieved thanks to Safety valve with trigger pressure set at 6 bar Solar Regulator for circulator management adjust ment It manages 9 system diagrams that can be se lected Refer to the specific manual...

Page 5: ...urn valve 2 Delivery Valve solar plant delivery with built in non return valve 3 Outlet temperature gauge 4 Return temperature gauge 5 Insulation 6 Solar controller 7 Display 8 Multidirectional joysti...

Page 6: ...TO INTEGRATION COIL Upper coil continuous efficiency ACS 10 45 C Vbu reference volume Coil delivery temperature 80 C T 20 C 16 1 23 31 4 31 4 kW 400 572 774 774 l h 70 C T 20 C 10 3 17 20 7 20 7 kW 2...

Page 7: ...t 70 C 374 438 659 863 l 60 C 284 375 531 675 l 50 C 205 310 390 485 l DESCRIPTION SOLAR STATION TECHNICAL DATA Safety valve calibration pressure 6 bar Maximum operating temperature 110 C Power supply...

Page 8: ...recommended for a correct maintenance and access to the device b When installing the boiler allow sufficient space around it to access all safety and control devices and to permit easy maintenance 11...

Page 9: ...50 1 33 450 1 33 520 1 33 520 mm DF Flange internal diameter 130 130 130 130 mm A 1120 1420 1270 1570 mm B 171 171 208 207 mm C 403 393 427 443 mm D M8 threaded inserts for grounding point accessory h...

Page 10: ...mnipolar magneto thermal circuit breaker and a disconnecting switch compliant with the pre vailing standards of the installation country respect the polarity of the L1 Phase N Neutral connections use...

Page 11: ...together with mains power cables and or AC cables Absolutely avoid routing cables close to strong mag netic fields Avoid any cable jointing as much as possible solder and duly insulate any indispensa...

Page 12: ...VR counter clockwise Close taps A and B b During system flushing pay attention to water com ing out of the taps as vapour could be released with risk of burns or scalds Use suitable personal protec ti...

Page 13: ...een eliminated Close the manual bleed valve and any vent valves opened previously Turn handle on valve VR counter clockwise Temporarily raise the pressure in the system to 4 bar Start up the system fo...

Page 14: ...any wiring and electric devices below to protect them against any leakage of heat transfer fluid Close valves VR and VM by turning handle clock wise by 90 Open taps A and B and drain the solar circui...

Page 15: ...he product End user 23 TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with external temperatures above 0 C set the hea...

Page 16: ...23 A 23900 Lecco LC www berettaboilers com The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore...

Reviews: