background image

GENERAL INFORMATION

7

EMPTYING IN 10’

IDRA DS FI

200

300

430

550

PERFORMANCE RELATING TO INTEGRATION COIL

Quantity of domestic water obtained in 10’ with heater pre-heated to 60°C (*) and primary exchanger at the in-

dicated delivery temperature, considering an increase of the domestic water temperature of 30°C between inlet 

and outlet (according to EN 12897).

Upper coil delivery temperature

80°C

166

260

330

345

l

70°C

138

255

323

340

l

60°C

131

250

308

336

l

PERFORMANCE RELATING TO SOLAR COIL

Quantity of domestic water obtained in 10’ with heater pre-heated to the indicated temperature (**) considering 

an increase of the domestic water temperature of 30°C between inlet and outlet (according to EN 12897).

Temperature of accumulation tank lower part

70°C

374

438

659

863

l

60°C

284

375

531

675

l

50°C

205

310

390

485

l

DESCRIPTION

SOLAR STATION TECHNICAL DATA

Safety valve calibration pressure

6

bar

Maximum operating temperature

110

°C

Power supply

230~50

V-Hz

Min/max electrical current draw

0,08 ÷ 0,58

A

Min/Max power consumption

5 ÷ 63

W

Pressure drops

TOP COIL

PRESSURE DROP (mbar)

400

300

200

500

100

0

0

1000

2000

3000

4000

300

200

430

550

FLOW RATE (l/h)

Useful head available

BOTTOM COIL

USEFUL HEAD AVAILABLE (mbar)

700

650

600

0

400

200

300

500

100

700
650

550

450

500

600

400
350
300

0

400 600 800 1000

200

1200 1400

200

300

430

550

200

300

430

550

FLOW RATE (l/h)

Values referred to a mix of water and 30% glycol.

The circulator speed is controlled through PWM signal and 

varies according to the thermal gradient between solar col-

lectors and storage.

Pay  attention  to  the  system  overall  flow  resistance  (ex-

changer, solar collectors and pipes) at the maximum flow 

rate conditions provided.

Summary of Contents for IDRA DS 200 FI

Page 1: ...Installation and Operation Manual Solar Solar storage cylinder IDRA DS FI Installation and Operation Manual EN...

Page 2: ...following symbols are used in this manual b CAUTION Identifies actions that require caution and adequate preparation a STOP Identifies actions that you MUST NOT do This manual Code Rev comprises page...

Page 3: ...p the product purchase documents to be presented to the B authorised Technical Assis tance Centre to request a service call under warranty b Size the solar expansion tank so as to ensure com plete abs...

Page 4: ...chieved thanks to Safety valve with trigger pressure set at 6 bar Solar Regulator for circulator management adjust ment It manages 9 system diagrams that can be se lected Refer to the specific manual...

Page 5: ...urn valve 2 Delivery Valve solar plant delivery with built in non return valve 3 Outlet temperature gauge 4 Return temperature gauge 5 Insulation 6 Solar controller 7 Display 8 Multidirectional joysti...

Page 6: ...TO INTEGRATION COIL Upper coil continuous efficiency ACS 10 45 C Vbu reference volume Coil delivery temperature 80 C T 20 C 16 1 23 31 4 31 4 kW 400 572 774 774 l h 70 C T 20 C 10 3 17 20 7 20 7 kW 2...

Page 7: ...t 70 C 374 438 659 863 l 60 C 284 375 531 675 l 50 C 205 310 390 485 l DESCRIPTION SOLAR STATION TECHNICAL DATA Safety valve calibration pressure 6 bar Maximum operating temperature 110 C Power supply...

Page 8: ...recommended for a correct maintenance and access to the device b When installing the boiler allow sufficient space around it to access all safety and control devices and to permit easy maintenance 11...

Page 9: ...50 1 33 450 1 33 520 1 33 520 mm DF Flange internal diameter 130 130 130 130 mm A 1120 1420 1270 1570 mm B 171 171 208 207 mm C 403 393 427 443 mm D M8 threaded inserts for grounding point accessory h...

Page 10: ...mnipolar magneto thermal circuit breaker and a disconnecting switch compliant with the pre vailing standards of the installation country respect the polarity of the L1 Phase N Neutral connections use...

Page 11: ...together with mains power cables and or AC cables Absolutely avoid routing cables close to strong mag netic fields Avoid any cable jointing as much as possible solder and duly insulate any indispensa...

Page 12: ...VR counter clockwise Close taps A and B b During system flushing pay attention to water com ing out of the taps as vapour could be released with risk of burns or scalds Use suitable personal protec ti...

Page 13: ...een eliminated Close the manual bleed valve and any vent valves opened previously Turn handle on valve VR counter clockwise Temporarily raise the pressure in the system to 4 bar Start up the system fo...

Page 14: ...any wiring and electric devices below to protect them against any leakage of heat transfer fluid Close valves VR and VM by turning handle clock wise by 90 Open taps A and B and drain the solar circui...

Page 15: ...he product End user 23 TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with external temperatures above 0 C set the hea...

Page 16: ...23 A 23900 Lecco LC www berettaboilers com The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore...

Reviews: