background image

INSTALLATION

9

13  WATER CONNECTIONS

N

C

E

D

F

G

H

I

L

M

B

AD

UAC

MC

Psc

RL

RC

Psr

EAF

A

DF

VE

M R

190mm

100mm

DESCRIPTION

IDRA DS FI

200

300

430

550

VE 

Expansion tank fitting

1/2” M

Ø

UAC 

Domestic hot water outlet

1” M

Ø

MC 

Outlet from boiler

1” M

Ø

RC 

Return to boiler

1” M

Ø

Outlet from solar collector

1” M

Ø

Return to solar collector

1” M

Ø

RL 

DHW recirculation

1” M

Ø

EAF (SB)  Domestic cold water inlet

1” M

Ø

Psc 

Diameter/length of boiler sensor socket

16/180

mm

Psr 

Diameter/length of solar controller sensor socket

16/180

mm

AD 

Quantity/diameter/length of magnesium anode

1/33/450 1/33/450 1/33/520 1/33/520

mm

DF 

Flange internal diameter

130

130

130

130

mm

A

1120

1420

1270

1570

mm

B

171

171

208

207

mm

C

403

393

427

443

mm

M8 threaded inserts for grounding point/accessory 

handles connection

700

700

700

700

mm

E

738

903

824

1088

mm

F

878

1113

964

1328

mm

G

953

1233

1064

1428

mm

H

1029

1323

1174

1538

mm

I

1098

1438

1289

1653

mm

L

1170

1670

1440

1784

mm

M

1338

1838

1644

1988

mm

N

Ø 604

Ø 604

Ø 755

Ø 755

mm

It is recommended to install shut-off valves at domestic water inlet and outlet.

Check the efficiency of the seals when filling/refilling the storage cylinder.

Any electric junction between probe cable and extensions for the connection to the electric panel must be soldered 

and protected with a sheath or a suitable electric insulation.

Summary of Contents for IDRA DS 200 FI

Page 1: ...Installation and Operation Manual Solar Solar storage cylinder IDRA DS FI Installation and Operation Manual EN...

Page 2: ...following symbols are used in this manual b CAUTION Identifies actions that require caution and adequate preparation a STOP Identifies actions that you MUST NOT do This manual Code Rev comprises page...

Page 3: ...p the product purchase documents to be presented to the B authorised Technical Assis tance Centre to request a service call under warranty b Size the solar expansion tank so as to ensure com plete abs...

Page 4: ...chieved thanks to Safety valve with trigger pressure set at 6 bar Solar Regulator for circulator management adjust ment It manages 9 system diagrams that can be se lected Refer to the specific manual...

Page 5: ...urn valve 2 Delivery Valve solar plant delivery with built in non return valve 3 Outlet temperature gauge 4 Return temperature gauge 5 Insulation 6 Solar controller 7 Display 8 Multidirectional joysti...

Page 6: ...TO INTEGRATION COIL Upper coil continuous efficiency ACS 10 45 C Vbu reference volume Coil delivery temperature 80 C T 20 C 16 1 23 31 4 31 4 kW 400 572 774 774 l h 70 C T 20 C 10 3 17 20 7 20 7 kW 2...

Page 7: ...t 70 C 374 438 659 863 l 60 C 284 375 531 675 l 50 C 205 310 390 485 l DESCRIPTION SOLAR STATION TECHNICAL DATA Safety valve calibration pressure 6 bar Maximum operating temperature 110 C Power supply...

Page 8: ...recommended for a correct maintenance and access to the device b When installing the boiler allow sufficient space around it to access all safety and control devices and to permit easy maintenance 11...

Page 9: ...50 1 33 450 1 33 520 1 33 520 mm DF Flange internal diameter 130 130 130 130 mm A 1120 1420 1270 1570 mm B 171 171 208 207 mm C 403 393 427 443 mm D M8 threaded inserts for grounding point accessory h...

Page 10: ...mnipolar magneto thermal circuit breaker and a disconnecting switch compliant with the pre vailing standards of the installation country respect the polarity of the L1 Phase N Neutral connections use...

Page 11: ...together with mains power cables and or AC cables Absolutely avoid routing cables close to strong mag netic fields Avoid any cable jointing as much as possible solder and duly insulate any indispensa...

Page 12: ...VR counter clockwise Close taps A and B b During system flushing pay attention to water com ing out of the taps as vapour could be released with risk of burns or scalds Use suitable personal protec ti...

Page 13: ...een eliminated Close the manual bleed valve and any vent valves opened previously Turn handle on valve VR counter clockwise Temporarily raise the pressure in the system to 4 bar Start up the system fo...

Page 14: ...any wiring and electric devices below to protect them against any leakage of heat transfer fluid Close valves VR and VM by turning handle clock wise by 90 Open taps A and B and drain the solar circui...

Page 15: ...he product End user 23 TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with external temperatures above 0 C set the hea...

Page 16: ...23 A 23900 Lecco LC www berettaboilers com The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore...

Reviews: