27
Bentone
A
A
A
6.5 Replacement of electrical
components
1.
Switch off the mains power.
2.
Note the connection of the existing component.
3.
Remove the existing component.
4.
Install the new component using the same wiring as the existing
component or the specifi ed alternative arrangement.
5.
Turn on the mains power.
6.
Check the function of the new component.
7.
Start the burner and check the combustion*
!
Use caution when
operating the burner,
surfaces may be hot.
6.6 Check oil line seals
Once the burner has been installed and commissioned, the seals of the
various coupling elements should be checked (A).
When a leak is detected, it is usually suffi cient to tighten the coupling
element that is leaking.
!
Använd Loctite 5188 på gängade oljeledningar
Note:
*
When servicing/replacing components that affect combustion, an
analysis and soot test must be carried out on the installation
!
If the burner is directly connected, ensure that all components on
the burner are without power.