Advice: in case you need to feed the retriever line into the snuffer bag later, you can help yourself with
the tiller extension or sail batten.
Fix the snuffer on the ring with 2-meter long dark grey 1,5 mm Dyneema rope (be careful you don't
mix it with black 3mm nylon rope, which is for the snuffer fixation on the cabin). Start in the bottom
starboard corner with the snuffer attachment point lead outside of the ring.
Summary of Contents for First 18
Page 5: ......
Page 20: ...3 2 Vang double block assembly Remove the shackle from the Ronstan RF20202 double block ...
Page 34: ......
Page 43: ...6 Mainsail controls 6 1 Boom assembly Fit the boom on the gooseneck and insert the bolt ...
Page 46: ......
Page 85: ......
Page 87: ...Hoist the jib completely while closing the pocket ...
Page 93: ...Tension the cunningham For a start apply medium tension better less than too much ...
Page 108: ...tack of the mainsail will be straight without folds ...