Gennaker system connected parts (from left to right and from top to bottom):
-
1x snuffer bag
-
2x gennaker sheet (grey-blue, tapered)
-
2 m 1,5 mm Dyneema rope for snuffer fixation on the ring
-
2 m 3 mm nylon rope for snuffer cabin fixation
-
1 m 3 mm nylon rope for snuffer aft fixation
-
1x Ronstan RF25100 block with lashing rope
-
2x Ronstan RF56100 block with ratchet
-
2x Ronatan RF45101 block
2.4. Shrouds and halyards
Summary of Contents for First 18
Page 5: ......
Page 20: ...3 2 Vang double block assembly Remove the shackle from the Ronstan RF20202 double block ...
Page 34: ......
Page 43: ...6 Mainsail controls 6 1 Boom assembly Fit the boom on the gooseneck and insert the bolt ...
Page 46: ......
Page 85: ......
Page 87: ...Hoist the jib completely while closing the pocket ...
Page 93: ...Tension the cunningham For a start apply medium tension better less than too much ...
Page 108: ...tack of the mainsail will be straight without folds ...