89
Breakdown
Break down the oil pump according to the following
picture.
⑤
④
⑥
⑦
⑧
③
②
①
⑪
⑩
⑨
①
screw
②
outer rotor
③
inner rotor
④
oil pump
⑤
oil pump shaft
⑥
pin
⑦
spacer
⑧
split washer
⑨
oil pump cover
⑩
cotter pin
⑪
oil pump screw
Note:
After assembly, the inner and outer rotors shall rotate flexibly without being seized.
9.3.3 Installation
Install it in reverse order.
Summary of Contents for ZAFFERAN 250
Page 1: ...1 ZAFFERANO 250 Service Manual ...
Page 14: ...14 Ignition spark ignition DC capacitance system Diameter of rear brake disc mm φ250mm ...
Page 50: ...50 B L B R BL W W G B BL W W G B ...
Page 80: ...80 Rear Wheel Rear Suspension ...
Page 85: ...85 Lubricating system diagram 1 camshaft 2 oil pump 3 crank 4 fuel filter ...
Page 90: ...90 Cooling System Connects to radiator Flows back to radiator Water pump ...
Page 93: ...93 Cylinder Head Valves ...
Page 112: ...112 Driving Disc Clutch Driven Wheel ...
Page 114: ...114 V BELT CLUTCH AND SECONDARY PRIMARY SHEAVE ...
Page 115: ...115 SECONDARY SHEAVE ...
Page 126: ...126 input shaft middle shaft output shaft ...
Page 130: ...130 left crankcase crankshaft right crankcase ...
Page 131: ...131 magneto start the main gear gasket ...
Page 143: ...143 Inspection and Maintenance of Electronic Fuel Injection EFI System ...
Page 165: ...165 17 2 7 2 Appearance of the oxygen sensor ...
Page 179: ...179 Then check the corresponding fault according to the fault code list ...