FLOOR PLAN
Model
A
Capacity
XPR-12CL
155” / 3937 mm
12,000 LBS
XPR-15CL
155” / 3937 mm
15,000 LBS
XPR-18CL
155” / 3937 mm
18,000 LBS
APPROACH
A
STEP 4
(Site Layout)
1. Determine which side of the Lift will be the approach
side.
2. Determine where the Power Unit will be located. The
POWER SIDE Post has the Power Unit Mounting Bracket
attached to the side.
3. Use the chart on page 13 to determine which Lift width
layout you would like to use.
4. Once a location is determined, use a carpenters chalk
line to layout an alignment line for the Post locations. Keep
all dimensions square within 1/8” (3mm) or malfunctioning of
the Lift can occur. (See Fig 4.1)
5. After the Post locations are properly marked, use chalk
or crayon to make an outline of the Posts on the floor
at each Post location using the Post Base Plates as a
template.
6.
CHECK ALL DIMENSIONS TWICE
and make sure that
the layout is perfectly square.
Fig 4.1.
USE BASE PLATE EDGES TO ALIGN POSTS
CHALK LINE
Summary of Contents for XPR-12CL
Page 14: ...14 HOSE ROUTING Side of Post ...
Page 27: ...27 ...
Page 30: ...30 30 OPTIONAL EQUIPMENT INSTALLATION ...
Page 46: ...46 ...
Page 47: ...47 ...
Page 48: ...48 Depends on model ...
Page 61: ...61 ...
Page 64: ...64 ...