25
YOU MUST RE-INSTALL TOP CARRIAGE-STOP BOLT (SHOWN BELOW). TIGHTEN CARRIAGE-STOP
BOLT TO 2-3 FT.-LBS. OF TORQUE UPON FINAL INSTALLATION INSPECTION.
THESE INSTRUCTIONS MUST BE FOLLOWED TO ENSURE PROPER INSTALLATION
AND OPERATION OF YOUR LIFT. FAILURE TO COMPLY WITH THESE INSTRUCTIONS CAN RESULT
IN SERIOUS BODILY INJURY AND/OR DEATH AND/OR VOID PRODUCT WARRANTY.
MANUFACTURER WILL ASSUME NO LIABILITY FOR LOSS OR DAMAGE OF ANY KIND, EXPRESSED
OR IMPLIED RESULTING FROM IMPROPER INSTALLATION OR USE OF THIS PRODUCT.
CARRIAGE STOP BOLT INSTALLATION
Summary of Contents for XPR-12CL
Page 14: ...14 HOSE ROUTING Side of Post ...
Page 27: ...27 ...
Page 30: ...30 30 OPTIONAL EQUIPMENT INSTALLATION ...
Page 46: ...46 ...
Page 47: ...47 ...
Page 48: ...48 Depends on model ...
Page 61: ...61 ...
Page 64: ...64 ...