13
6. Route both Hoses in their respective Posts
PRIOR
to
standing up the Posts. When routing the Hydraulic Hose
through the Posts, make sure to route them through the
Retaining Clips
welded inside each Post. Make sure
that the Hose is clear of any moving parts. It may be
necessary to tie the Hose clear of obstructions by using
nylon tie straps or wire. Refer to Step 10.
BE SURE TO ROUTE THE HYDRAULIC HOSES
THROUGH THE RETAINING CLIPS WELDED
INSIDE EACH POST.
Fig 3.7
EQUALIZER CABLE ROUTING
M10 Spring
Lock
Washer
Fig 3.6
M10 Hex
Head Bolt
M10 Flat
Washer
M10 Hex Nut
CABLE
THREADED
END
BUTTON
END
Summary of Contents for XPR-12CL
Page 14: ...14 HOSE ROUTING Side of Post ...
Page 27: ...27 ...
Page 30: ...30 30 OPTIONAL EQUIPMENT INSTALLATION ...
Page 46: ...46 ...
Page 47: ...47 ...
Page 48: ...48 Depends on model ...
Page 61: ...61 ...
Page 64: ...64 ...