18
18
StEP 9
(
Installing the Safeties and Safety Cable)
1. Install Safety Weldments into each respective Column.
(See Figs 9.1 & 9. 2)
2. From the Offside Column insert the non looped end
of the Safety Cable through the hole located to the right of
the Offside Safety Weldment. (See Fig 9.3)
3. Route the Cable under the Pulley and take it up to the
Top Trough. (See Fig 9.4)
DANGER !
ENSuRE tHAt BotH tHE
PoWERSIDE & oFFSIDE SAFEtIES ENGAGE
PRoPERLy PRIoR to LIFt oPERAtIoN.
Fig 9.1
Fig 9.2
Fig 9.3
Fig 9.4.
Summary of Contents for XpR-10AC-168
Page 25: ...25 25 ...
Page 28: ...28 ...
Page 32: ...32 32 OPTIONAL EQUIPMENT INSTALLATION ...
Page 42: ...42 42 ...
Page 43: ...43 43 ...
Page 52: ...52 52 ...
Page 74: ...74 ...
Page 75: ...75 ...