99
StEP 1
(Selecting Site)
Before installing your new lift, check the following.
1.
LIFt LoCAtIoN
: Always use architects plans when
available. Check layout dimension against floor plan
requirements making sure that adequate space if
available.
2.
oVERHEAD oBStRuCtIoNS
: The area where the
lift will be located should be free of overhead
obstructions such as heaters, building supports, electrical
lines etc.
3.
DEFECtIVE FLooR
: Visually inspect the site where
the lift is to be installed and check for cracked or
defective concrete.
4.
oPERAtING tEMPERAtuRE.
Operate lift only
between temperatures of 41° -104° F.
5. Lift is designed for
INDooR INStALLAtIoN oNLy.
StEP 2
(Floor Requirements)
This lift must be installed on a solid level concrete
floor with no more than 3-degrees of slope. Failure
to do so could cause personal injury or death.
A level floor is suggested for proper use and
installation and level lifting. If a floor is of questionable
slope, consider a survey of the site and/or the possibility
of pouring a new level concrete slab.
t
Do Not
install or use this lift on any asphalt surface
or any surface other than concrete.
t
Do Not
install or use this lift on expansion seams
or on cracked or defective concrete.
t
Do Not
install or use this lift on a second / elevated
floor without first consulting building architect.
t
Do Not
install or use this lift outdoors.
CoNCREtE SPECIFICAtIoNS
LIFt MoDEL CoNCREtE REQuIREMENtS
10,000 Lb Models
4” Min. Thickness / 3,000 PSI
12,000 Lb Models
6” Min. Thickness / 3,000 PSI
15,000 Lb Models
6” Min. Thickness / 3,000 PSI
18,000 Lb Models
8” Min. Thickness / 3,000 PSI
DANGER!
All models MUST be installed on 3000 PSI concrete only
conforming to the minimum requirements shown above.
New concrete must be adequately cured by at least
28 days minimum.
IMPoRtANt NotICE!
These instructions must be followed to insure proper installation and operation of your lift.
Failure to comply with these instructions can result in serious bodily harm and void product warranty.
Manufacturer will assume no liability for loss or damage of any kind, expressed or implied resulting
from improper installation or use of this product.
PLEASE READ ENtIRE MANuAL PRIoR to INStALLAtIoN !
t
Rotary Hammer Drill or Similar
t
3/4” Masonry Bit
t
Hammer
t
4 Foot Level
t
Open-End Wrench Set: SAE/Metric
t
Socket And Ratchet Set: SAE/Metric
t
Hex-Key / Allen Wrench Set
t
Large Crescent Wrench
t
Large Pipe Wrench
t
Crow Bar
t
Chalk Line
t
Medium Flat Screwdriver
t
Tape Measure: 25 Foot Minimum
t
Needle Nose Pliers
tooLS REQuIRED
IMPoRtANt NotE:
BendPak lifts are supplied with installation instructions and concrete fasteners meeting the criteria as prescribed
by the American National Standard "Automotive Lifts - Safety Requirements for Construction, testing, and
Validation" ANSI/ALI ALCtV-2006. Lift buyers are responsible for any special regional structural and/or seismic
anchoring requirements specified by any other agencies and/or codes such as the Uniform Building Code (UBC)
and/or International Building Code (IBC).
Summary of Contents for XpR-10AC-168
Page 25: ...25 25 ...
Page 28: ...28 ...
Page 32: ...32 32 OPTIONAL EQUIPMENT INSTALLATION ...
Page 42: ...42 42 ...
Page 43: ...43 43 ...
Page 52: ...52 52 ...
Page 74: ...74 ...
Page 75: ...75 ...