10
10
PARtS INVENtoRy
Be sure to take a complete inventory of parts prior to beginning installation.
Description
Qty
Top Trough Assembly with Trip Stop and Equalizer Pulleys Installed
1
Front Arm Assembly
2
Rear Arm Assembly
2
Offside Column with Lift Head Assembly
1
Powerside Column with Lift Head Assembly
1
Post Extension
2
Hydraulic Cylinder
2
Parts Box
(Packing List Enclosed)
1
Parts Bag
(Packed in Part Box)
1
Hydraulic Power Unit
1
When removing the lift from shipping angles pay close attention as the posts
can slide and can cause injury. Prior to removing the bolts make sure the
posts are held securely by a fork lift or some other heavy lifting devise.
Summary of Contents for XpR-10AC-168
Page 25: ...25 25 ...
Page 28: ...28 ...
Page 32: ...32 32 OPTIONAL EQUIPMENT INSTALLATION ...
Page 42: ...42 42 ...
Page 43: ...43 43 ...
Page 52: ...52 52 ...
Page 74: ...74 ...
Page 75: ...75 ...