6. Follow procedures of Step 3 (Closeout Side Post Instal-
lation) for the Power Side Posts then continue to the next
item. Remember to make sure ALL Cable Sheaves are re-
moved prior to raising Posts.
7. Locate the Front and Rear Short Crosstubes and slide
the Crosstube Endplates in between the Crosstube Clevises
and align the thru holes. Make sure the Short Angle Bracket
faces towards the Base Plates. (See Fig. 5.6-5.7)
8. Install the supplied M18 bolts, washers, spring lock
washers, and nuts to securely fasten the Short Crosstubes
to the Power Post and Front Post. (See Fig. 5.8)
Fig 5.4
Fig 5.5
Fig 5.6
Fig 5.3
M10 x 58mm Bolt
Spacer
Safety Cable
Connector
Note: Cut-away view for clarification.
Fig 5.7
Front Short
Crosstube
Rear Short
Crosstube
Front Post
Short Angle
Brackets
Fig 5.8
M18 Nut
M18 Spring
Lock Washer
M18 Bolt
M18 Washer
Summary of Contents for PL-14000
Page 25: ...25 ...
Page 29: ...29 Not provided by BendPak 4450mm lg 2500mm lg 2200mm lg Multiple Unit Hydraulic Hose Routing ...
Page 35: ...35 ...
Page 36: ...36 ...
Page 41: ...41 Grease Port Lubrication Locations Lubricate Once A Week ...
Page 43: ...43 ...