18
2. Install the 90-degree Hydraulic Fittings in the port at the
ram end of the cylinder. On the pipe thread side of the
Fitting it is recommended to use Teflon tape or pipe sealer.
DO NOT USE TEFLON TAPE on the JIC flared end.
(See Fig. 10.3 )
3. Install the 90-degree Air Fitting fitting in the port at the
base end of the Cylinder. On the pipe thread side of the
Fitting it is recommended to use Teflon tape or pipe sealer.
(See Fig. 10.4)
4. Install one end of Flex Hose to into hole in the
4. Install one end of Flex Hose to into hole in the
POWERSIDE RUNWAY adjacent to the Power Unit. Install
POWERSIDE RUNWAY adjacent to the Power Unit. Install
the other end of the Flex Hose to the Flex Hose Bracket
the other end of the Flex Hose to the Flex Hose Bracket
Assy. Tighten securely. (See Fig. 10.5)
Assy. Tighten securely. (See Fig. 10.5)
5. Connect Hoses as shown below making sure to pass
through the retaining rings. MAKE SURE HOSES ARE
KEPT CLEAR OF CABLES. (See Fig. 10.6 )
6. Run the Power Unit Hydraulic Hose (90
˚
fitting end
towards HPU) and the Return Hydraulic Air line through the
Flex Hose to the Power Unit. (See Fig. 10.7)
7. Connect the Power Unit Hydraulic Line (90
˚
End) to the
90
˚
Power Unit Fitting. Connect the Return Air Line to the
90
˚
Air Fitting. (See Fig. 10.8)
Fig 10.3
Fig 10.5
Fig 10.6
Fig 10.7
Fig 10.8
Fig 10.4
Fig 10.8
Summary of Contents for HD-14
Page 8: ...8 Assembly View ...
Page 21: ...21 ...
Page 27: ...27 HD 9 12 12X 14 14X Series Rolling Jack Air Line Installation Kit Part 5174009 REV 06 04 09 ...
Page 28: ...28 Adapter Plate Required for HD 9 12 14 Adapter Plate Required for HD 9 12 14 ...
Page 31: ...31 ...
Page 32: ...32 ...
Page 38: ...38 ...