17
STEP 10
( Routing Hydraulic Hoses )
1. Install the 90-degree hydraulic fitting to the POWER PORT and the 90* Air Fitting to the RETURN PORT of the Power
unit and connect the Hydraulic Hoses as described below. It will be necessary to remove the shipping plugs from both ports
prior to installing the Fittings. (See Fig. 10.1 - 10.2)
DO NOT run power unit with no oil. Damage to pump can occur.
The power unit must be kept dry. Damage to power unit caused by water or other liquids such as
detergents, acid etc., is not covered under warranty.
Operate lift only between temperatures of 41 °- 104° F.
Improper electrical hook-up can damage motor and will not be covered under warranty.
Motor can not run on 50HZ without a physical change in motor.
Use a separate breaker for each power unit.
Protect each circuit with time delay fuse or circuit breaker.
For 208-230 volt, single phase, use a 25 amp fuse.
For 208-230 volt, three phase, use a 20 amp fuse.
For 380-440 volt, three phase, use a 15 amp fuse.
The standard power unit for your lift is 220 volt, 60HZ, single phase. All wiring must be performed by a certi
fi
ed electrician only.
SEE WIRING INSTRUCTIONS AFFIXED TO MOTOR FOR PROPER WIRING INSTRUCTIONS.
Fig 10.2
Fig 10.1
NOTE:
Check the Power Unit to determine proper connection ports for Power and Return lines.
It will be necessary to remove shipping plugs from both ports prior to installing Fittings.
Summary of Contents for HD-14
Page 8: ...8 Assembly View ...
Page 21: ...21 ...
Page 27: ...27 HD 9 12 12X 14 14X Series Rolling Jack Air Line Installation Kit Part 5174009 REV 06 04 09 ...
Page 28: ...28 Adapter Plate Required for HD 9 12 14 Adapter Plate Required for HD 9 12 14 ...
Page 31: ...31 ...
Page 32: ...32 ...
Page 38: ...38 ...