16
3. After routing the Cables double-check to make sure
all are properly positioned and remain within the grooves
of ALL Sheaves. (See Fig. 8.4 - 8.5)
STEP 9
( Power Unit Installation )
1. . Mount the Power Unit, the Flex Tube Mount-
ing Bracket, the Vibration Dampener and the Air Valve
Mounting Bracket to the Power Unit Mounting Bracket
using the M8 hex bolts and nylon nuts. (See Fig. 9.1)
2. Fill the reservoir with 12 quarts of 10-WT hydraulic oil
or Dexron III automatic transmission fluid.
DANGER!
DO NOT PERFORM ANY MAINTENANCE OR
INSTALLATION OF ANY COMPONENTS WITH OUT
FIRST ENSURING THAT ELECTRICAL POWER HAS
BEEN DISCONNECTED AT THE SOURCE OR PANEL
AND CANNOT BE RE-ENERGIZED UNTIL ALL
MAINTENANCE AND/OR INSTALLATION
PROCEDURES ARE COMPLETED.
DANGER !
ALL WIRING MUST BE PERFORMED
BY A LICENSED ELECTRICIAN.
Fig 8.3
Fig 8.4
Fig 8.5
Fig 9.1
Summary of Contents for HD-14
Page 8: ...8 Assembly View ...
Page 21: ...21 ...
Page 27: ...27 HD 9 12 12X 14 14X Series Rolling Jack Air Line Installation Kit Part 5174009 REV 06 04 09 ...
Page 28: ...28 Adapter Plate Required for HD 9 12 14 Adapter Plate Required for HD 9 12 14 ...
Page 31: ...31 ...
Page 32: ...32 ...
Page 38: ...38 ...