Inspection and maintenance
20
BEKOMAT® 31U
Note:
It is imperative to observe all hazard statements and warnings listed here.
Please also observe all regulations and notes regarding industrial safety and fire prevention at the place
of installation.
As a matter of principle, only use suitable and appropriate tools and materials in a proper condition.
Do not use aggressive cleaners and improper devices such as high-pressure cleaners.
Please note that condensates may contain aggressive or harmful components. Therefore, skin contact
should be avoided.
Condensate is subject to mandatory waste disposal. As such, it must be collected in suitable containers,
and disposed of or processed properly.
Maintenance recommendation:
After 2 x 8,760 operating hours or one million
switching cycles, a maintenance message is released.
The green power LED flashes. Afterwards, or at the
latest after two years (2 x 8,760 operating hours),
the service unit (5) needs to be replaced.
1.
Prior to the replacement of the service unit,
a reset needs to be carried out. The control unit
is released by actuating the arresting hook.
When removed, the TEST button below the LED
must be pressed and held for at least five seconds.
2.
Remove the control unit (1) by
pressing the arresting hook (2)
3.
Unfasten the BEKOMAT
®
31U from the outlet (3).
4.
Remove the design shell (4) (if there is one)
using a screwdriver (10).
5.
Detach the service unit (5) from the tubing
at the inlet by removing the union nut.
6.
or
remove the screws (6)
from the angle nozzle (7).
1
2
3
4
5
6
7
8
9
10