3.4 Function description
Illustration
Description / explanation
39
X1
F
The condensate flows via the condensate inlet
[F]
into the
BEKOMAT
®
and collects in the housing
[X1]
.
The filling level in the housing
[X1]
is continuously
monitored by a capacitive sensor in the sensor tube
[39]
.
X2X
X1
23
D
Once the condensate has reached the maximum fill level,
the pilot valve
[X2]
is activated using the controller.
The pilot valve
[X2]
activates, and the area above the
membrane
[23]
is depressurised.
The membrane
[23]
lifts off the valve seat and the excess
pressure in the housing
[X1]
presses the condensate into
the condensate discharge
[D]
.
X2
23
D
39
F
When the sensor in the sensor tube
[39]
is no longer
covered by condensate, the controller of the pilot
valve
[X2]
activates and pressure builds up above the
membrane
[23]
.
The membrane
[23]
is pressed against the valve seat and
the condensate discharge
[D]
is sealed tightly.
The switching cycle starts again with the feed of
condensate.
Original installation and operation manual
BEKOMAT
®
14i / 14i CO / 14i CO PN25
19 | 76