Page
20 ©
BEKA 2017 All rights reserved!
...a product of
12.4 Exchange of barrel
1. Step:
Depressurize the pump and lock it against unintentional operation.
2. Step:
Install suitable lifting straps or chains at the bracket (1).
3. Step:
Loosen the connecting rods (if available) from the cover (2) and remove them.
Unscrew the wing screws (3).
4. Step:
Pull out the device with cover, by means of a suitable lifting device. Absolutely
observe the regulations for the lifting of loads. Do not lift the grease barrel.
Also take care that the pump pipe (5) is not damaged or polluted.
5. Step:
Pull out the grease follower plate (4) from the empty barrel. Press the follower
plate into the new barrel and install the device in reverse order. Also observe
that the old and the new barrel have the same diameters and height. Tighten
the three wing screws at the cover. Install the connecting rods (if available).
Use only barrels with original grease filling!
Do not use refillable barrels.
Device may only be lifted without barrel.
Attention!
1
3
2
4
5