![BEKA Stream E 2520 Series Original Operating And Assembly Manual Download Page 13](http://html1.mh-extra.com/html/beka/stream-e-2520-series/stream-e-2520-series_original-operating-and-assembly-manual_2723985013.webp)
Page
13 ©
BEKA 2017 All rights reserved!
...a product of
9.
Assembly instructions
Check the device for possible transport damage and for completeness before the assembly. Any installed equipment for transportation
safety has to be removed.
Comply with the following conditions for assembly of the device in order to obtain a properly built together machine of
all parts without compromise of safety or persons’ health:
Assemble the device in balance on the installation location in order to ensure safe operation. Observe the information on the fastening
holes given in the dimensional drawing. When selecting the set-up location, please mind that the device should be protected against
ambiental and mechanic influences. Ensure full access, e.g. for filling with lubricant.
Special measures concerning noise prevention or oscillation reduction do not have to be taken.
9.1 Line
assembly
Professional layout!
When using pipes, observe that they are clean, seamless and of precision steel!
Assemble the pipes professionally and free from distortion!
Pay attention to pressure tightness of fittings!
All components must be approved for max. operating pressure (see technical data).
9.2 Power
connection
Power supply must be done by a professional electrician!
Electrical device components must be wired professionally!
Compare voltage details with the existing mains voltage!
Equipotentional bonding must be done professionally by the operator via an according ground connection!
Wire the device according to the terminal diagram!
Terminal diagram Motor
If the motor braids are not connected correctly, the motor does not start to operate.
Note!