To add a break-point using the

&

or

*

button

select

5Et

from the configuration menu and press

(

which will result in the

Add

sub-function prompt

being displayed. To enter the sub-function press

(

which will reveal the current break-point and

the total number of break-points which have
already been entered. When adding a break-point
the insertion position can be selected using the

&

and

*

push buttons followed by

(

push button

to insert the additional break-point. In previously
uncalibrated linearisers each new break-point
should be added in front of the highest existing
break-point, if this sequence is not followed a

FaiL

message will occur when the break-points are
calibrated.  See example in section 7.2.1.

The delete a break-point, sub-function

dEL

operates in exactly the same way as the

Add

sub-

function described above. Once within the

dEL

function each time the

(

button is pressed a

break-point is removed. When deleting a break-
point from a calibrated indicator, the break-point to
be deleted can be selected using the

&

and

*

push buttons.

The minimum number of break-

points is 2, break-points 

0

 

:1

 and 

1

 

:1

.

When the required number of linearising break-
points has been entered, return to the linearisation
sub-menu by pressing

)

.

The indicator will

display the

Add

or

dEL

prompt depending upon the

last sub-function used. The indicator input current
and corresponding indicator display at each break-
point, which is the segment finishing point as
shown in Fig 9, can now be entered using the

in

and 

di5P

 sub-functions.

Using the

&

or

*

button select

in

from the sub-

menu and press

(

which will reveal the starting

point for the first segment

0 : n

, where n is the total

number of break-points entered. Press

(

and use

the

&

and

*

buttons and the

(

button to move

between digits, to enter the input current in
milliamps at which the first break-point is required,
usually 4.000mA. When set as required, press

)

to return to the

0 : n

prompt from which the next

break-point can be selected using the

&

and

*

buttons. When the required break-point has been
selected press

(

and enter the indicator input

current at which this break-point is required using
the

&

and

*

buttons and the

(

button to move

between digits. Repeat this procedure until the
indicator input current at all the break-points has
been defined and then return to the

in

sub-

function by pressing the 

)

 button. 

The corresponding indicator display at each of the
break-points can now be defined using the

di5P

sub-function. Using the

&

and

*

buttons select

the

di5P

sub-function and press

(

which will

reveal the starting point for the first break-point

0

 

:

 

n

,

where

n

is the total number of break-points

entered.

Press

(

and use the

&

and

*

buttons and the

(

button to move between digits, to enter the

required indicator display at the first break-point.
When set as required, press

)

to return to the

0

 

:

 

n

prompt from which the next break-point can be
selected using the

&

or

*

buttons. When the

required break-point has been selected press

(

and set the required indicator display at this

break-point.

Repeat this procedure until the indicator display at
all the break-points has been defined and then
return to the

5Et

function in the configuration menu

by pressing the 

)

 button twice.

Error message

If during calibration the indicator displays
a

FAiL

error message the current at which

the selected break-point is being set is not
above the proceding break-point or is not
below the following break-point.

7.2.1

Example
Adding break-points to a new indicator

When adding break-points to a new indicator, or to
a lineariser following resetting to the factory
defaults using the

LtAb

function described in

section 6.11, each additional break-point should be
added before the highest existing breakpoint.
The first additional break-point should be added
before the default break-point

1

 

:1

which will result

in a display of

1

 

:

 

2

. If more new break-points are

required, using the

*

button select the new

highest break-point

2

 

:

 

2

and add the second

additional break-point by operating the

(

push

button which will result in a display of

2

 

:

 

3

. Repeat

the sequence until the required number of break-
points has been entered.

7.3

Under and over-range

The lineariser does not change the under and
over-range indication described in section 6.12. At
input currents below that specified for the first
break-point

0

 

:

 

n

, the indicator will continue to use

the specified slope of the first segment.

At input currents above that specified for the last
break-point

n

 

:

 

n

, the indicator will continue to use

the slope specified for the last lineariser segment.

7.4

Lineariser default configuration

When the lineariser is reset to the factory defaults
using the

LtAb

function described in section 6.11,

the defaults conditions are:

Indicator display

BA304G      BA324G

                                                            BA304G-SS  BA324G-SS

 First break-point

0

 

:1    4mA

0.0

0.00

 Second break-point 1 :1  20mA

100.0

100.00

Summary of Contents for BA304G

Page 1: ...Issue 5 19th September 2018 BA304G BA304G SS BA324G BA324G SS intrinsically safe loop powered field mounting indicators Issue 5...

Page 2: ...to a new indicator 7 3 Under and over range 7 4 Lineariser default configuration 8 Maintenance 8 1 Fault finding during commissioning 8 2 Fault finding after commissioning 8 3 Servicing 8 4 Routine ma...

Page 3: ...sting and Certification Ltd and comply with the European ATEX Directive 2014 34 EU The EC Type Examination certificate specifies that under fault conditions the output voltage current and power at the...

Page 4: ...d Body Intertek Testing and Certification Ltd have issued all the models with a common EC Type Examination Certificate number ITS11ATEX27253X This confirms compliance with harmonised European standard...

Page 5: ...face of the instrument assembly It shows the ATEX and IECEx certification information and BEKA associates name and location Non European certification information may also be shown The instrument seri...

Page 6: ...sufficient to drive the indicator plus the interface When a high integrity earth connection is already available a Zener barrier is usually the least expensive option If an earth connection is not ava...

Page 7: ...ing cable screens If field wiring is to be terminated prior to the installation of the indicator assembly the GRP models BA304G and BA324G can be supplied with an optional back box terminal assembly w...

Page 8: ...for joining cable screens 5 6 Units of measurement and tag marking on scale card The indicator s units of measurement and tag information are shown on a scale card which slides into the indicator New...

Page 9: ...e card carefully insert it into the slot on the right hand side of the input terminals as shown in Fig 6b Force should be applied evenly to both sides of the scale card to prevent it twisting The card...

Page 10: ...A324G BA304G SS BA324G SS Access code CodE 0000 0000 Function FunC Linear Linear Display at 4mA 2ero 0 0 0 00 Display at 20mA 5PAn 100 0 100 00 Resolution rE5n 1 digit 1 digit Bargraph start BarLo 0 0...

Page 11: ...11...

Page 12: ...Lin 16 segment adjustable lineariser To reveal the indicator s existing function select FunC from the configuration menu and press If the function is set as required press to return to the menu or pre...

Page 13: ...e two currents is greater than 4mA If these conditions are not complied with the indicator displays FaiL and aborts the calibration c If the zero current is greater than the span current the instrumen...

Page 14: ...on and oFF When set as required press to return to the tARE prompt in the configuration menu 6 10 Security code CodE Access to the instrument configuration menu may be protected by a four digit securi...

Page 15: ...ws direct calibration of the lineariser with an external current source and is the preferred method when traceability is required If the exact system non linearity is unknown this method also allows d...

Page 16: ...16...

Page 17: ...g break point 7 1 1 Example Adding break points to a new indicator When adding break points to a new indicator or to a lineariser following resetting to the factory defaults using the LtAb function de...

Page 18: ...pressing the button The corresponding indicator display at each of the break points can now be defined using the di5P sub function Using the and buttons select the di5P sub function and press which wi...

Page 19: ...ertificate is available If an indicator fails after it has been functioning correctly follow the procedure shown in section 8 1 If this does not reveal the cause of the fault it is recommended that th...

Page 20: ...ered the backlight produces green background illumination enabling the display to be read at night or in poor lighting conditions No additional power supply intrinsic safety interface or field wiring...

Page 21: ...rgency shut down system Both models can be supplied with factory fitted dual solid state single pole alarm outputs Each alarm output may be independently configured as a high or low alarm with a norma...

Page 22: ...simple apparatus This simplifies system documentation and allows the alarm output terminals 8 9 and 10 11 to be connected to almost any intrinsically safe circuit protected by a Zener barrier or galv...

Page 23: ...23...

Page 24: ...tpoint The alarm is activated when the indicator display equals the setpoint See section 9 3 5 Hi Lo Alarm function Defines the alarm function as High or Low See section 9 3 6 no nC Normally open or n...

Page 25: ...for fail safe operation both alarm outputs should be conditioned to be open in the alarm condition nC To check or change the alarm output status select no nC from the alarm configuration menu and pre...

Page 26: ...t having access to the indicator configuration menu Protection against accidental adjustment of the setpoints when the indicator is in the display mode is provided by a separate security code This dir...

Page 27: ...tpoint plus the displayed value to be represented or a low and a high setpoint plus the displayed value to be represented by the bargraph as shown in Fig 18 Fig 18 Displayed value and setpoints on bar...

Page 28: ...d into a panel aperture The kit provides an IP66 seal between the indicator and the instrument panel it is therefore suitable for mounting a stainless steel indicator in a sealed panel enclosure 9 6 B...

Page 29: ...nly persist for a short period Be used with dust in subdivisions IIIA combustible flyings IIIB non conductive dust IIIC conductive dust Having a Minimum Ignition Temperature of Dust cloud 120 C Dust l...

Page 30: ...cifies the following certification codes Ex ia IIC T5 Ga Ex ia IIIC T80 C Da IP66 Ta 40 C to 70 C The specified IECEx gas and dust intrinsic safety parameters are identical to the ATEX safety paramete...

Page 31: ...70 C CL II Div 1 Groups E F G 40 C Ta 60 C CL III Div 1 40 C Ta 60 C USA Zone classification CL I Zone 0 AEx ia IIC T5 Ga 40 C Ta 70 C Zone 20 AEx ia IIIC T80 C Da 40 C Ta 60 C Canada Zone classificat...

Page 32: ...32...

Page 33: ...33...

Page 34: ...34...

Page 35: ...35...

Page 36: ...36...

Page 37: ...37...

Page 38: ...38...

Page 39: ...39...

Reviews: