
GT-650/GT-900 User's Manual
40
Continuity of L and N conductors will be carried out automatically after
finishing R
INS
step.
L/N condition test (OK/shorted) will be carried out automatically after finishing
previous step. CORD test is thus finished.
Figure 31: CORD test connection
Display
explanation:
Figure 32: Idle display in CORD test (example), left picture - test adapter
compensated (C present), right picture – test adapter not compensated (C not
present)
1 ...... “SEL” menu key (GT-900 only), for selection of measurement function
(CORD, PRCD, PRCD-S, PRCD-S+ or PRCD-K).
2 ...... “COMP” menu key for compensation of test adapter.
3 ...... “
F:
AUT” / “
F:
MAN” menu key for selection of automatic /
manual start of the measurement.
4 ...... “PAR” menu key for pass/fail limit value setting of protective
earth and for selecting test current (0.2 or 5.0 A).
5 ...... Clock.
6 ...... Used test current (0.2 A = L or 5.0 A = H).
7 ...... Pre-set pass/fail limit value for protective earth bond R
PE
.
8 ...... “C” symbol (compensation) (test adapter is compensated).
9 ...... Selected mode of start of the measurement (MAN or AUT).
MAN (manual) ... Use START key to start the measurement.
AUT (automatic) ... The test is started automatically after connecting
the cord to be tested to Test Socket and to Test Connector CORD. START
key is not active in this mode.
10 .... Function selected by the rotary switch (6) and the “SEL” menu key.
Summary of Contents for GT-650
Page 1: ......
Page 2: ...GT 650 GT 900 User s Manual 2 ...
Page 3: ...GT 650 GT 900 User s Manual 3 GT 650 GT 900 User s Manual ...
Page 108: ......