Commissioning
C7015
27
Version: 1.0
4.2.2
Mounting the Industrial PC
NOTE
Extreme environmental conditions
Extreme environmental conditions can cause damage to the device.
• Avoid extreme environmental conditions.
• Protect the device from moisture and heat.
When installing in the control cabinet, note that there must be 5 cm of free space above and below the
device for ventilation of the PC.
Regardless of whether you want to mount the Industrial PC inside or outside a control cabinet, this is done
using the flexible mounting concept. In both cases, you must provide the wall intended for mounting with the
necessary holes for the fastening screws according to the device dimensions of the PC (see chapter 4.2.1
). You need M5 screws for mounting.
After you have drilled the holes for the fastening screws on the corresponding wall, you can now mount the
Industrial PC using the mounting concept via the rear panel or the side panel.
Fig. 14: C7015_Mounting with mounting concept
To install the Industrial PC, follow the steps below:
1. Place the Industrial PC in the desired orientation over the drill holes at the marked points of the mounting
concept (see Fig. 14).
2. Insert the fastening screws one after the other and screw them tight.
ð
You have successfully installed the Industrial PC.
If you have mounted an EtherCAT P Box module directly on the Industrial PC (see chapter 4.2.3
), you can mount the Industrial PC with the module exclusively via the rear
panel (see Fig. 15).