9.
Check whether there is fuel in the hopper.
10.
Check whether the pivot (J) functions.
11.
Check that the worm conveyor/auger can turn.
12.
If necessary, increase the boiler temperature and check that the shunt, if any, is
open.
13.
If the smoke gas temperature exceeds 260°C, the augur stops for reasons of
operating economy. The augur couples in again at a smoke gas temperature of
230°C. The boiler must be cleaned.
1.18 Preventive maintenance
The packing round the hopper lid must close up and be air-tight, and this must be checked regularly
(at least once per year).
We also recommend an annual check of the back-burning protection function and a check of the pre-
pressure in the high container/pressure tank (must be 0.2-0.3 bar without water content, which is valid for
a waterworks pressure of min. 2.0 bar).
For best boiler function, operating economy and boiler life, we recommend taking out a service contract
with a competent service company authorised by BAXI for annual inspection and servicing of the boiler.
1.19 Summer stop
The boiler must be thoroughly cleaned if it is stopped completely in summer. Leave the bottom door open
so that air can circulate and keep the boiler dry.
If the boiler is fitted with an oxygen probe, the probe must be calibrated before firing is resumed.
Leave the boiler with power connected for about 10 minutes until calibration is completed. The boiler
may then be lit. (See instructions for oxygen control.)
Page 15
2 Automation
Nevertheless, money can be saved by automating your heating system so that heating is not used to warm
up the whole house at times when this is unnecessary.
We recommend mounting automatic shunt regulation equipment - Danfoss ECL.