
5
Fig. 14
Fig. 16
Fig. 17
Fig. 15
Fig. 14a
9
39
40
39
79
78
9
CONEXIONADO CUADRO BÁSICO (2 ETAPAS) CON QUEMADORES /
LIGAÇÃO QUADRO BÁSICO (2 ETAPAS) - QUEIMADOR /
ELECTRICAL CONNECTION OF BASIC CONTROL PANEL (2 STAGE) WITH BURNERS
CRONO 8-G2, CRONO 15-G2, CRONO 20-G2, CRONO 30-G2, TECNO 28-G, TECNO 34-G, TECNO 44-G,
CRONO 10-L2, CRONO 15-L2, CRONO 20-L2, CRONO 25-L2, TECNO 28-L, TECNO 34-L, TECNO 38-L , TECNO 44-L
Summary of Contents for CPA 100-BTH
Page 33: ...33...