Page 4
Fitting the Appliance
PREPARATION
1) A sound and level floor which conforms to the requirements of the Local Authorities and Building
Regulations must be provided.
2) Select the most suitable position for the boiler taking due account of any clearances required for
the safe and proper functions of the boiler and its associated controls.
Summary of Contents for BOSTON 40 OF
Page 9: ...fig 1 Pump in Casing Page 5 fig 2 Outer Case ...
Page 15: ...Page 8 Fig A One Zone Valve Fully Pumped System ...
Page 16: ...Fig B Sundial Gravity System ...
Page 17: ...Fig C 2 Zones Valve Fully Pumped System ...
Page 20: ...fig 7 Burner Controls fig 8 Boiler Thermostat Page 10 ...
Page 23: ...Fig 9 Insulation Combustion Box Door Fig 10 Baffle Securing Screws ...
Page 24: ...fig 11 Door Burner 60 50 40 fig 12 Door Burner 80 70 ...
Page 29: ...fig 16 Insulation Page 14 Short Parts List ...
Page 30: ......