2) Remove the outer case top panel by pulling upwards.
3) Remove the two facia retaining screws (
) taking care not to lose the two spacer washers
and allow the facia to swing forwards on its hinges.
4) Release the thermostat capillary from behind its retaining clip and remove the thermostat phial
from the boiler (
).
5) Remove the screw securing the thermostat cover to the facia.
6) Disconnect the three spade electrical terminals from the thermostat.
7) Pull off the thermostat knob and remove the locknut securing the thermostat to the facia panel.
8) Reassemble in reverse order of dismantling ensuring that the thermostat phial is replaced into
the thermostat pocket.
HONEYWELL GAS VALVE (Fig 15)
1) Remove the burner and controls assembly as described in steps
2) Disconnect the thermocouple nuts at the valve and at the pilot bracket.
3) Disconnect the pilot feed pipe at the valve and at the pilot bracket ensuring that the pilot injector
is not misplaced.
4) Disconnect the electrode lead and remove the piezo unit.
5) Remove the screw securing the electrical terminal cover to the gas valve. Disconnect the
electrical connections.
6) Remove the valve complete with the heat shield and inlet pipe by disconnecting the flanged
injector manifold.
7) Disconnect the flanged inlet pipe. Retain the O rings for reassembly but replace if damaged.
8) Remove the heat shield by undoing the retaining screw.
9) Release the thermocouple reroute nut and remove the reroute.
10) lndividual sub components of the valve may be replaced as outlined by Honeywell instructions.
11) Reassemble in reverse order of dismantling.
INSULATION IN COMBUSTION BOX
1) Remove the burner and controls assembly as described in steps
2) Release the 2 screws securing the front insulation assembly and remove the assembly (
).
3) Remove the two screws and washers securing the two side insulation panels (
) and
carefully remove diagonally through the door opening.
4) Remove the two screws and washers securing the back panel insulation (
).
5) Remove the ceramic insulation pad from the front insulation assembly by bending the securing
tabs.
6) 60,50,40 OF ONLY Remove the two sloping panels of insulation adjacent to the heat
exchanger by removing 4 screws and washers. Ease out the bottom edge of the insulation panel
Summary of Contents for BOSTON 40 OF
Page 9: ...fig 1 Pump in Casing Page 5 fig 2 Outer Case ...
Page 15: ...Page 8 Fig A One Zone Valve Fully Pumped System ...
Page 16: ...Fig B Sundial Gravity System ...
Page 17: ...Fig C 2 Zones Valve Fully Pumped System ...
Page 20: ...fig 7 Burner Controls fig 8 Boiler Thermostat Page 10 ...
Page 23: ...Fig 9 Insulation Combustion Box Door Fig 10 Baffle Securing Screws ...
Page 24: ...fig 11 Door Burner 60 50 40 fig 12 Door Burner 80 70 ...
Page 29: ...fig 16 Insulation Page 14 Short Parts List ...
Page 30: ......