and slide down (
).
7) Replace insulation as necessary and bend down securing tabs where applicable.
8) Reassemble in reverse order of dismantling taking care not to damage the new insulation.
PIEZO UNIT (
1) Remove the burner and controls assembly as described in steps
2) Disconnect the electrode lead at the piezo unit.
3) Remove the nut securing the piezo unit to the heat shield and remove the piezo unit.
4) Reassemble in reverse order of dismantling.
SPARK ELECTRODE (
)
1) Remove the burner and controls assembly as described in steps
2) Disconnect the electrode lead at the electrode.
3) Remove the nut securing the electrode and remove the electrode.
4) Reassemble in reverse order of dismantling.
Page 13
fig 15 Control Assembly
Summary of Contents for BOSTON 40 OF
Page 9: ...fig 1 Pump in Casing Page 5 fig 2 Outer Case ...
Page 15: ...Page 8 Fig A One Zone Valve Fully Pumped System ...
Page 16: ...Fig B Sundial Gravity System ...
Page 17: ...Fig C 2 Zones Valve Fully Pumped System ...
Page 20: ...fig 7 Burner Controls fig 8 Boiler Thermostat Page 10 ...
Page 23: ...Fig 9 Insulation Combustion Box Door Fig 10 Baffle Securing Screws ...
Page 24: ...fig 11 Door Burner 60 50 40 fig 12 Door Burner 80 70 ...
Page 29: ...fig 16 Insulation Page 14 Short Parts List ...
Page 30: ......