9.2
Floor sealing (All Installations).
Using the floor sealing tape supplied, seal the bottom
of the convector box to the fireplace and hearth
floor. Run the tape over the centre bracket (See figure
16).
10. BURNER INSTALLATION
10.1 Burner and supply pipe installation.
1.
Refit the burner unit to the convector box using the two screws removed previously
2.
Connect the supply line to the appliance.
3.
If closed
,
open the isolating valve at the inlet ‘T’ connector.
4.
Turn on the gas supply and pressure check the installation pipework for gas
soundness. In the United Kingdom check in accordance with the current edition of BS
6891. In the Republic of Ireland refer to the current edition of I.S. 813 “Domestic gas
installations”.
10.2.1 Lighting the burner.
Some burner operations can be checked at this stage. Checking now will mean that less
disassembly will be required if any problems are found.
A full check should still be
made, however, after final installation.
Before lighting the burner ensure that any protective film has been removed from
the fascia.
1.
Depress the control knob and rotate it anticlockwise to the pilot ignition position. A
'click' will be heard as the integral piezo operates. A spark should be seen between the
electrode and pilot tip.
2.
Turn the control knob clockwise to the 'Off' position. Repeat this operation until a
flame appears at the pilot. There may be a delay before the pilot lights due to air being
purged from the system. When a flame appears at the pilot keep the control knob
depressed and hold the pilot ignition position for five seconds. When the control knob is
released the pilot flame should remain lit.
Page 19
INSTALLER GUIDE
Figure 16. Floor sealing