
27
Installation
The installation must be carried out by a suitably
qualified person, in accordance with the current
version of the following.
o
UK Regulations and Safety Standards or their European
Norm Replacements.
o
Building Regulations (issued by the Department of the
Environment).
o
Building Standards (issued by the Scottish Development
Department).
o
IEE Wiring Regulations.
o
Electricity At Work Regulations.
o
Gas Safety (Installation and Use) (Amendment)
Regulations.
Positioning
The adjacent furniture and all materials used in the
installation must be able to withstand a minimum
temperature
of
85°C
above
the
ambient
temperature of the room it is located in, whilst in
use.
o
Your appliance is heavy, so you should be careful when moving
or positioning it.
o
Do not try to move the cooker by pulling on either the door,
handle or control panel.
Summary of Contents for BC192.2TCSS
Page 1: ...1 finKirThat BC192 2TCSS 90 cm dual fuel twin cavity range cooker...
Page 41: ...41...
Page 42: ...42...
Page 43: ...43...
Page 44: ...44...