MAINTENANCE
BG 25 / 2011 /
2254_BG25_en_0000498763_V01
9 - 2
9.3
MAINTENANCE PLAN
9.3.1
Entire Equipment
Entire equipment table
Components
Maintenance interval
Operation
10 h
daily
50 h
weekly
250 h
monthly
500 h
3 months
1000 h
yearly
2000 h
yearly
3000 h/
every
2 years
Note
Entire equipment
Visual inspection
- Missing or damaged parts
X
- Load-bearing steel components
(e.g. the undercarriage, upper car-
riage, boom, auxiliary boom, sup-
porting boom, kinematic triangle,
mast sections, masthead, winch
trestles and the connection be-
tween the piston eyes and the hy-
draulic cylinders and piston rods)
should undergo visual inspection
prior to mounting to check for fis-
sures and other damage.
X
- Missing or loose
bolts / bolted connections.
X
- Missing or damaged
safety devices, such as
fire extinguisher,
first-aid kits,
warning signs
X
- Leaks
X
Check for proper function of:
- Controls and indicators
X
- Safety devices such as
emergency STOP,
pilot control safety stick,
limit switches,
hoist limit switches
X
- Free-fall function**
X
Work platforms
- Check for missing or loose
pin/screw connections
X
- Check the locks can move easily
and are working properly
X
Inspection by competent engineer
X
* Only during running-in period
**
Not supplied with this version