7.5.3.2 Installing the Upper Crowd Rope
Select "winch rigging" mode.
Extend rope tensioning cylinder (1).
Remove crowd sledge stoppers from transport position (2) and install them at upper
end of mast (3).
7 3
1
3
5 3
2
6
4
6
2
7
1
5
4
BFASE192.wmf
Remove crowd rope from transport deposit.
Move crowd sledge down to lowermost point.
Pass end of rope behind guide sheave (4), up and around upper left guide sheave
(5) down to guide sheave on sledge (6), counter-clockwise back up to sheave (7) on
upper end of mast to rope tension cylinder (1).
Anchor rope end with wedge to rope tension cylinder (1).
WARNING!
Serious injury hazard!
3 wraps of upper crowd rope and 3 wraps of lower crowd rope must be
installed on the drum of the crowd winch, for safety reasons.
Retract rope tensioning cylinder to tension the crowd ropes.
Run the crowd sledge up and down several times.
Run the crowd sledge down to the lowermost point.
Retract rope tensioning cylinder to re-tension the crowd ropes.