RIGGING / DE-RIGGING
BG 25 / 2011 /
2254_BG25_en_0000498763_V01
7 - 26
7.8.3
Removing the Ropes
7.8.3.1 Removing the Main and Auxiliary Rope
The main rope and the auxiliary rope will be retrieved with the mast lying down.
Select the "Winch rigging" mode.
Remove rope guard pins from the masthead.
Select main winch or auxiliary winch.
Carefully spool in rope by the left control lever.
Unthread the ropes from the contactor weights of the hoist limiters.
Spool in both rope ends to the intermediate guide block.
Reinstall the rope guard pins on the masthead.