Move crowd sledge into position for transport (see fig.).
● Remove sledge upper end stoppers from upper mast section and reinstall into
transport position (16).
● Completely extend the rope tensioning cylinder (7).
● Remove the rope clip (14).
● At the rope tensioning cylinder, remove the pin from the rope end socket (15).
● Knock the wedge (13) out, to relieve the rope, and pull the rope out of the socket.
● Remove the entire rope.
● Coil the rope loosely and fix it to the lower end of the mast.