
Installation
37
3.3 Accessories
In order to ensure engine durability and
performance, the accessory installation must
meet the following items:
During installation, add proper O-ring
sealing in the cooling system pipes. As
figure 3.3, the O-ring should be
arranged
in
the
flange
before
connecting pipe with coolant pump inlet.
When connecting pipe of air and
cooling system, be sure to use the high
quality rubber pipe to avoid the
unnecessary leakage.
Figure 3.3 - Coolant pump inlet port